JNSM

 

“As per guidelines, The SPPD will be responsible for creating the internal transmission network on behalf of the solar project developers. SECI grant up to Rs. 20 lakh/MW or 30% of the project cost including Grid-connectivity cost, whichever is lower. The responsibilities of SPPD: i) Acquisition of land ii) Getting land related clearances iii) Developing approach road to each plot iv) Developing internal transmission system and maintaining it. v) Making arrangement to connect to the grid i.e. ISTS or State Transmission Network. vi) Providing basic drainage. vii) Providing water supply (minimum essential quantity).