West Bangal Open access charges

Posted · Add Comment
   

West Bengal Electricity Regulatory Commission

 
Charges for 5 MW at 11 KV industrial consumer availing Intra-State Open Acess for 1 Month
Monthly Open Acess Charges
CAPACITY 5 MW at 11 kV for one month (Short Term) Considering Tariff of WBSEDCL (Assuming 5MW power is  
 

SL No

 

Particular

   

Charges

 

Total(Rs.)

Charges for 5 MW capacity for 1 Month(Rs.)  

Remarks

 

1

Total Power Transferred in a Month (Units)  

A

   

3600000

 

Unit

 

Assuming LF=100%

 

2

 

Transmission Loss of % in kind which will be deducted from the energy input

 

B

   

 

4076087

 

 

Unit

4% Normative for Transmission system
3 Net Tranmission Charges(Rs./MW) C 1292.15 270543.91   Charge is in Rs./MW/day
4 Wheeling Charges(Paise/kWh) D 55.35      
 

5

 

Wheeling Loss of % in kind which will be deducted from the energy input

 

 

E

       

8% Normative technical loss for HV system as per Regulation

 

6

 

Net wheeling charge Rs./kwh

 

 

F

 

0.5535 Rs./kwh

 

2165869.58

  80% of the Wheeling Charge for

Long Term Customer of respective category

 

 

7

 

Operating Charges(SLDC Charges) [Rs./kWh]

 

 

G

 

 

2paise/100 unit

 

 

815.22

  As per Regulation 3(a) of The West Bengal Electricity RegulatoryCommission(Miscellen eous Provisions) Regulation, 2005
8  

Reactive Energy Charges

 

H

Assumed Nil since amount of Reactive energy drawn below 97% of normal voltage and at voltage

higher than 103% of normal voltage is not known

9 Cross Subsidy surcharge (Paise/unit) I 224.99                  9170788.14
10 Additional surcharge J Not yet fixed by the Commission
11 Interconnection Charges K Not Applicable here
12  

Standby Charges *

 

L

Will be finalised as per PPA between the Distribution Licensee and the OA customer as per The West Bengal Electricity Regulatory Commission(Open Acess) Regulations 2007
13 Parallel operation charges M Not applicable in WBERC area
14 Other Charge  
   

a) Meter Reading & Other Charges

 

N

 

Rs.2000.00

 

2000.00

  As per Regulation 14.3.4 of The

West Bengal Electricity Regulatory Commission(Open Acess) Regulations 2007

   

b) Handling & Service Charges

 

O

1.5%x(Transmissio n Charge+Wheeling Charge)  

36546.20

  As per Regulation 14.3.5 of The West Bengal Electricity Regulatory Commission(Open Acess) Regulations 2007
15 Connectivity Charges P Not applicable in WBERC area
 

 

16

 

 

OA Application Registration Fee

 

 

Q

 

 

10000.00

 

 

10000.00

  Considering ‘other’ category as per Regulation no 14.3.2 of The West Bengal Electricity Regulatory Commission(Open Acess) Regulations 2007
17 OA Agreement fee R No such Fees prevailing
18 UI Charges UI Charges will be applicable as per regulation no 14.3.7 of The West Bengal Electricity Regulatory

Commission(Open Acess) Regulations 2007

19 Net Open Acess Charge S S=c+f+g+i+n+o+q 11656563.04    
20 Effective Open Access

Charge(Rs/unit)

 

T

 

T= (S/A)

 

3.24

   
+ Considering Normal, seasonal Tariff during Summer Time      
* Backup power, Stand by power, Incidental power and Start-up power charges shall be payable as per agreement with the concerned Licensee
 