[ezcol_1half]

The Govt. of Chhattisgarh has released the solar energy policy on 20th November 2012. This policy will be operative till 31st March 2017.The state govt. aims to achieve a target solar power generation capacity between 500MW to 1,000MW by March 2017.

The state announced the incentives including interest subsidy, fixed capital, investment subsidy, exemption from electricity and stamp duty, exemption/concession in land premium, project report subsidy and technical patent subsidy.

Roof top Solar

  • Rooftop PV Solar Power Projects, with a capacity of more than 50 kW and up to 1MW.
  • Period under these Regulations shall be of three years, from 01.04.2013 to 31.03.2016.
  • The tariff period shall be 25 years.
  • Tariff determined under these Regulations will be generic levellised tariff.

[/ezcol_1half]

[ezcol_1half_end]

Chhattisgarh solar policy 2012-17

[/ezcol_1half_end]