Broad Scope:

170 MW Tender in Uttarakhand Remarks 1 Scheme Uttarakhand  Solar Power Policy 2013

 

Downloading of RfS document:

From 17/9/2015 to 12/10/2015

Pre Bid Meeting:

26/09/2015 (Saturday) at 12.00 Noon

Cost of RfS Document:

Rs. 5,000 (Non-refundable) Inclusive of 5% VAT in the form of Demand Draft/ banker’s cheque/ pay order drawn in favor of “Director, UREDA”, payable at “Dehradun”

Processing Fee (non-refundable):

Rs.25,000 per MW In the form of Demand Draft/ banker’s cheque/ pay order drawn in favour of “Director, UREDA”, payable at “Dehradun”.

Total Capacity Offered & Site Location:

Minimum Capacity 100 kW & Maximum Capacity 50 MW , Grid Connectivity, Interconnection Point and Metering arrangement As per UERC Regulations, 2013 as amended from time to time Location of Solar Project Anywhere in the State of Uttarakhand

Minimum value of CUF

CUF (%) Minimum CUF: 12% in any given contract year If the developers achieve the CUF greater than 22% for Solar PV in any given contract year, the applicable Tariff shall be 50% of the project tariff for such additional generated power above the 22% CUF from the developers.

Tariff

PPA Between UPCL and the Selected Bidder(s) For 25 years 15 Net Worth The “Net Worth” of the company should be equal to or greater than the value calculated at the rate of Rs 3 Crore or equivalent US$ per MW.