Firstgreen Consulting Pvt Ltd

Solar Rooftop without any upfront investment

Rooftop Solar PPA at APPITI

APPITI-Amalgamated Plantations Private Industrial Training Institution,Bajrajhar, Odalguri BTAD, Railway Station Rd, Rowta, Assam 784508, India. It is under APPL Foundation (Amalgamated Plantation Ltd formerly called as Tata Tea Ltd.)  with not profit making organization  . Firstgreen installed a 80 kWp solar power plant at APPITI roof, which started supplying electricity to the entire APPITI campus in July 2019.The plant is expected to generate over 0.968 Lac electricity units to APPITI. The Net metering provisions have also been made in the campus to inject the surplus electricity in the grid.The system was designed to meet the life of the project for 25 years.Assam faces high wind speeds hence the system was designed to withstand a highest wind speed of 150 km/hr. The plant used best  best in class technology for PV modules and inverters and other components.

80 KWInstalled capacity

Reduce their electricity grid tariff by 35% for the solar energy generated and consumed on site

96800 kWhAnnual energy production

Reduce total annual electricity bill bby 35%

35% Energy bill reduction

Achieve forecast savings of Rs. 50 Lac over the 25-year PPA term

Highlight of 80 kWp solar plant

Under the Solar Power Purchase Agreement Firstgreen has installed the solar rooftop system at APPITI – The Amalgamated Plantations Private Industrial Training Institute and it owns and operates the system for the PPA tenure.  Firstgreen has signed the PPA for a tenure of 25 years. 

Procedure for Solar Rooftop PPA

Step-1

Finalise the Power Purchase Agreement with the client

The clients signs a 10 years or 25 years power purchase agreement (PPA) with Firstgreen.

Step-2

Installation of Rooftop Solar PV system without no upfront cost

Once the agreement has been signed, Firstgreen will fund and construct the PV system

Step-3

Sale of electricity to the client

After completion, in accordance with the agreement, Firstgreen will sell the client the energy generated on site at the agreed price until the end of the contract.

Step-4

Handover the plant to the building owner

We will handover the solar Plant to the building owner after completion of the PPA tenure. 

APPITI 80 KW Rooftop solar

Related Blog Posts

  1. https://www.firstgreen.co/2020/05/06/grid-connection-requirements-for-rooftop-solar-system/
  2. https://www.firstgreen.co/2020/05/06/ppa-model-for-solar-system/
  3. https://www.firstgreen.co/2020/05/05/key-aspects-for-a-ppa-business-model-for-rooftop-solar-system/

    Etiam magna arcu, ullamcorper ut pulvinar et, ornare sit amet ligula. Aliquam vitae bibendum lorem. Cras id dui lectus. Pellentesque nec felis tristique urna lacinia sollicitudin ac ac ex. Maecenas mattis faucibus condimentum. Curabitur imperdiet felis at est posuere bibendum. Sed quis nulla tellus.

    ADDRESS

    63739 street lorem ipsum City, Country

    PHONE

    +12 (0) 345 678 9

    EMAIL

    info@company.com

    become part of our

    contact us

    Talk To Us & We’ll Talk To You!

    Subscribe to Firstgreen blog

    Get notified about new articles on our blog