Green building certification

LEED Certification of BAANI City center

Baani City center is a mixed-use office and residential building with an area of about 25630 sq m located in village maidawas, sector – 63. The project had a requirement of LEED Gold certification and we as a consultant interacted with all the stakeholders in the project right from architect, landscape engineer, HVAC consultants by understanding the project and owner requirement. We found synergies between architectural design, MEP and landscape for a sustainable development. 

16%Energy Savings

Efficient lighting fixtures and chillers were used in the project.

41%Indoor water use reduction

All water fixtures installed in the building are low water consumption.

30%Increased ventilation

The project is supplied with increased ventilation to enhance occupancy comfort.

Building overview

Key Project information

Project Title: BAANI City center

Building Type: Office: Mixed-Use

Building Size:  25630 sq m

LEED Status: LEED for BD+C – CS Gold 

 

Strategies & results

  • Reduced 41% of water use through the installation of low flow fixture and dual flush system.
  • More than 75% of area uses daylight increasing visual comfort and productivity.
  • Ventilation is increased by 30% to enhance human comfort
  • Project uses Rain water harvesting system to collect storm water to reduce runoff and uses water for irrigation.
  • All the lighting fixtures in the building are LED fixtures and no fixture containing mercury is installed in the building.
  • 6.5% onsite renewable energy.
  • 16% of total energy consumption is system-level metered

Procedure for LEED CErtification

Step-1

Registration with USGBC

The building is registered with USGBC green building certification portal

Step-2

Data collection during the performance period

The building data is collected during the performance period related to energy, water, IEQ, Material, and waste management

Step-3

Review of documentation by USGBC

USGBC closely review all the documentation and the credits are awarded as per their norms.

Step-4

Final certification

Once all the review replies are satisfied by the USGBC review team, the building is awarded appropriate certification based on the credits approved. 

Related Blog Posts

    Etiam magna arcu, ullamcorper ut pulvinar et, ornare sit amet ligula. Aliquam vitae bibendum lorem. Cras id dui lectus. Pellentesque nec felis tristique urna lacinia sollicitudin ac ac ex. Maecenas mattis faucibus condimentum. Curabitur imperdiet felis at est posuere bibendum. Sed quis nulla tellus.

    ADDRESS

    63739 street lorem ipsum City, Country

    PHONE

    +12 (0) 345 678 9

    EMAIL

    info@company.com

    Cart

    become part of our

    contact us

    Talk To Us & We’ll Talk To You!

    Subscribe to Firstgreen blog

    Get notified about new articles on our blog