The Ol Tukai resort is situated at Ambosely national forest with no grid power supply. The resort needed year round reliable and cost effective off grid system which can run in tendom with the diesel generators. The Ol TUkai management was looking for a reliable and flexible solution where most of its power requirements can meet uop using the solar power and reduce its dependency on the diesel generators. The site was surrounded with large trees, and it was a challange to the Ol tukai management to explore a shadow free area within the campus. THe area was identified in a location about 150 m away from the diesel generators and a containerised solution for the energy storage system was proposed to Ol tukai management.
The solar panels are from jinko solar 550Wp each with monoiperc half cut cell technology
THe system is provided with 200 kWh energy storage system The system consists of US2000 Pylontech make Li Ion batteries.
The system works in tandem with 350 kVA Diesel generator of Cummines/Jakson make. A solar PV DG and ESS controller has been designed to control the system.
Solar Consultants Firstgreen Limited is a solar EPC and consulting firm specialized in providing Trunkey solutions for stand alone off grid and minigrid solutions to African market. Firstgreen has strong know how on the solar PV with energy storage solutions and has tie ups with best of its class suppliers. Firstgreen provides range of grid connected and off grid solutions to its clients in Africa region.
Firstgreen is an expert EPC and consulting firm in providing solar plus energy storage solutions with diesel generators. There are lot of resorts in Kenya which continuously run on diesel generators. This case study is an example of how these remote facilities can migrate towards the green solutions.
The system consists of a 100 kW Sinexcel inverter with 200 kWh Pylontech Li Ion battery. Solar panels generate electricity right since the morning and feeds electricity to the resorts loads directly. If the resort has low energy demand, the power is fed to the battery for charging the batteries. When the solar PV generation is low or in the night the loads are powered through the batteries. If the batteries are drained out the diesel generators automatically starts and feed the power to the loads. The surplus power of the diesel generators is also used to charge the batteries. This way the diesel generator running hours are reduced significantly and about 70% diesel savings are realised.
In the second phase of this project, once the resort loads have increased, additional inverter and battery capacities shall be added to make the system fully independent of the diesel generators.
The system consists of 100 kWp solar panels of 550 Wp each monoperc solar panels. The energy storage is from Pylontech US2000 Li Ion battery modules with total rack capacity of 200 kWh. The system is fully integrated system with Sinexcel inverters 100 kW capacity. ComAp control for solar PV+ESS+DG integration. The diesel generators are from Jakson -Cummines Diesel generators. CAN Multi protocol has been used for communication module
The Sinexcel inverters with Pylontech energy storage system was integrated in a containerized system and works in tandem with three diesel generators. The project generates about 150,000 kWh of clean energy on annual basis and reduces about 450,000 Lt of diesel consumption in the diesel generators. The system provides about 70% reduction in the diesel consumption of the resort. The payback period of the system is less than three years.
Firstgreen design team analysed the resort loads and configured the system sizing to meet the reliable power supply. The system can operate all the loads of the resort including the laundry machines, ovens, pumps, and other kitchen equipments. The Sinexcel inverter operates at 650V DC with MPPT charge controller features and inbuilt BMS and EMS solutions. The inverter is high efficiency of 95% and provides efficient operation with diesel generators. The battery management system perfactly manages the charging and discharging cycles of the Li Ion batteries. The overall operation of the system is controlled by energy management system which communicates with the diesel generators through Comap hybrid DG controllers. .
The complete system design and commissioning has been done by Firstgreen design and engineering team in India and project has been commissioned by our local team in Kenya.
As nations convene at COP meetings, the discourse extends beyond mitigation strategies to navigating...
The legacy of the UNFCCC extends beyond the outcomes of individual COP meetings, leaving an indelibl...
COP meetings orchestrated under the UNFCCC umbrella stand as catalytic events propelling global clim...
The COP meetings convened under the UNFCCC banner are not without their challenges, reflecting the d...
The United Nations Framework Convention on Climate Change (UNFCCC) stands as a beacon for fostering...
The annual Conference of the Parties (COP) meetings under the United Nations Framework Convention on...
As the United Arab Emirates (UAE) takes the reins to host COP 28, the significance of the theme,...
India, under the visionary leadership of Prime Minister Narendra Modi, has embarked on a remarkable...
For over two decades, The Energy and Resources Institute (TERI) has been at the forefront of organiz...
Embark on a poignant journey with Metas Sarmiento, a gifted Filipino artist, as he guides us from th...
Etiam magna arcu, ullamcorper ut pulvinar et, ornare sit amet ligula. Aliquam vitae bibendum lorem. Cras id dui lectus. Pellentesque nec felis tristique urna lacinia sollicitudin ac ac ex. Maecenas mattis faucibus condimentum. Curabitur imperdiet felis at est posuere bibendum. Sed quis nulla tellus.
63739 street lorem ipsum City, Country
+12 (0) 345 678 9
info@company.com