Firstgreen Consulting Pvt Ltd

Solar Rooftop without any upfront investment

Rooftop Solar PPA at NERIWALM

The North Eastern Regional Institute of Water and Land Management (NERIWALM) was established at Tezpur, Assam by North Eastern Council (NEC), in December, 1989 when NEC was under the Ministry of Home Affairs, Govt. of India. The Institute is situated in 3km away from the historically famous town of Tezpur, Sonitpur district of Assam which is located on the north bank of mighty river Brahmaputra at about 180 km from Guwahati. Firstgreen installed a 100 kWp solar power plant at NERIWALM roof, which started supplying electricity to the entire NERIWALM campus in November 2019. The plant is expected to generate over 1.21 Lac electricity units to NERIWALM. The Net metering provisions have also been made in the campus to inject the surplus electricity in the grid. The system was designed to meet the life of the project for 25 years. Assam faces high wind speeds hence the system was designed to withstand a highest wind speed of 150 km/hr. The plant used best  best in class technology for PV modules and inverters and other components.

100 KWInstalled capacity

Power is fed directly to the internal loads of North Eastern Regional Institute of Water and Land Management (NERIWALM). 

121000 kWhAnnual energy production

No Upfront investment from NERIWALM. 

30% Energy bill reduction

Guaranteed savings in your monthly electricity bill from solar PPA

Highlight of 100 kWp solar plant

Under the Solar Power Purchase Agreement Firstgreen has installed the solar rooftop system at North Eastern Regional Institute of Water and Land Management (NERIWALM) and it owns and operates the system for the PPA tenure.  Firstgreen has signed the PPA for a tenure of 25 years. 

Procedure for Solar Rooftop PPA

Step-1

Finalise the Power Purchase Agreement with the client

The clients signs a 10 years or 25 years power purchase agreement (PPA) with Firstgreen.

Step-2

Installation of Rooftop Solar PV system without no upfront cost

Once the agreement has been signed, Firstgreen will fund and construct the PV system

Step-3

Sale of electricity to the client

After completion, in accordance with the agreement, Firstgreen will sell the client the energy generated on site at the agreed price until the end of the contract.

Step-4

Handover the plant to the building owner

We will handover the solar Plant to the building owner after completion of the PPA tenure. 

NERIWALM 100 KW Rooftop solar

Related Blog Posts

  1. https://www.firstgreen.co/2020/05/06/grid-connection-requirements-for-rooftop-solar-system/
  2. https://www.firstgreen.co/2020/05/06/ppa-model-for-solar-system/
  3. https://www.firstgreen.co/2020/05/05/key-aspects-for-a-ppa-business-model-for-rooftop-solar-system/

    Etiam magna arcu, ullamcorper ut pulvinar et, ornare sit amet ligula. Aliquam vitae bibendum lorem. Cras id dui lectus. Pellentesque nec felis tristique urna lacinia sollicitudin ac ac ex. Maecenas mattis faucibus condimentum. Curabitur imperdiet felis at est posuere bibendum. Sed quis nulla tellus.

    ADDRESS

    63739 street lorem ipsum City, Country

    PHONE

    +12 (0) 345 678 9

    EMAIL

    info@company.com

    become part of our

    contact us

    Talk To Us & We’ll Talk To You!

    Subscribe to Firstgreen blog

    Get notified about new articles on our blog