Firstgreen Consulting Pvt Ltd

Solar Rooftop without any upfront investment

Rooftop Solar PPA at NETES

NETES Institute of Technology and Science, Mirza, Guwahati, Assam 781125, India. It has Society registration with not profit making organization under the name of under The North East Technical Education Society (NETES). Firstgreen installed a 80 kWp solar power plant at NETES roof, which started supplying electricity to the entire NETES campus in December 2018.The plant is expected to generate over 1.04 Lac electricity units to NETES. The Net metering provisions have also been made in the campus to inject the surplus electricity in the grid.The system was designed to meet the life of the project for 25 years.Assam faces high wind speeds hence the system was designed to withstand a highest wind speed of 150 km/hr. The plant used best  best in class technology for PV modules and inverters and other components.

80 KWInstalled capacity

Power is fed directly to the internal loads of NETES Institute of Technology and Science, Mirza.

104000 kWhAnnual energy production

No Upfront investment from NETES Institute of Technology and Science, Mirza.

30% Energy bill reduction

Guaranteed savings in your monthly electricity bill from solar PPA

Highlight of 80 kWp solar plant

Under the Solar Power Purchase Agreement Firstgreen has installed the solar rooftop system at NETES Institute of Technology and Science, Mirza and it owns and operates the system for the PPA tenure.  Firstgreen has signed the PPA for a tenure of 25 years. 

Procedure for Solar Rooftop PPA

Step-1

Finalise the Power Purchase Agreement with the client

The clients signs a 10 years or 25 years power purchase agreement (PPA) with Firstgreen.

Step-2

Installation of Rooftop Solar PV system without no upfront cost

Once the agreement has been signed, Firstgreen will fund and construct the PV system

Step-3

Sale of electricity to the client

After completion, in accordance with the agreement, Firstgreen will sell the client the energy generated on site at the agreed price until the end of the contract.

Step-4

Handover the plant to the building owner

We will handover the solar Plant to the building owner after completion of the PPA tenure. 

NETES 80 KW Rooftop solar

Related Blog Posts

  1. https://www.firstgreen.co/2020/05/06/grid-connection-requirements-for-rooftop-solar-system/
  2. https://www.firstgreen.co/2020/05/06/ppa-model-for-solar-system/
  3. https://www.firstgreen.co/2020/05/05/key-aspects-for-a-ppa-business-model-for-rooftop-solar-system/

    Etiam magna arcu, ullamcorper ut pulvinar et, ornare sit amet ligula. Aliquam vitae bibendum lorem. Cras id dui lectus. Pellentesque nec felis tristique urna lacinia sollicitudin ac ac ex. Maecenas mattis faucibus condimentum. Curabitur imperdiet felis at est posuere bibendum. Sed quis nulla tellus.

    ADDRESS

    63739 street lorem ipsum City, Country

    PHONE

    +12 (0) 345 678 9

    EMAIL

    info@company.com

    become part of our

    contact us

    Talk To Us & We’ll Talk To You!

    Subscribe to Firstgreen blog

    Get notified about new articles on our blog