EPC for 500 kW solar project for JK Lakshmi Cement at Cuttack
Projects, solar EPCrstgreen started the EPC work and conducted a detailed site survey by a surveyor as the main challenge in this project is land levels. The plant design and installation is very challenging but with the experience of our in-house team the plant is commissioned in specified time.